U.S. Code · Título 26
Energy credit
26 U.S.C. § 48
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Energy credit
In general
For purposes of section 46, except as provided in paragraphs (1)(B), (2)(B), and (3)(B) of subsection (c), the energy credit for any taxable year is the energy percentage of the basis of each energy property placed in service during such taxable year.
Energy percentage
In general
Except as provided in paragraphs (6) and (7), the energy percentage is—
6 percent in the case of—
Coordination with rehabilitation credit
The energy percentage shall not apply to that portion of the basis of any property which is attributable to qualified rehabilitation expenditures.
Nonapplication of increases to energy percentage
For purposes of energy property described in subparagraph (A)(ii), the energy percentage applicable to such property pursuant to such subparagraph shall not be increased or otherwise adjusted by any provision of this section.
Energy property
For purposes of this subpart, the term “energy property” means any property—
which is—
which meets the performance and quality standards (if any) which—
Special rule for property financed by tax-exempt bonds
Rules similar to the rule under section 45(b)(3) shall apply for purposes of this section.
Election to treat qualified facilities as energy property
In general
In the case of any qualified property which is part of a qualified investment credit facility—
Denial of production credit
No credit shall be allowed under section 45 for any taxable year with respect to any qualified investment credit facility.
Qualified investment credit facility
For purposes of this paragraph, the term “qualified investment credit facility” means any facility—
with respect to which—
Qualified property
For purposes of this paragraph, the term “qualified property” means property—
which is—
Phaseout of credit for wind facilities
In the case of any facility using wind to produce electricity which is placed in service before January 1, 2022, and treated as energy property by reason of this paragraph, the amount of the credit determined under this section (determined after the application of paragraphs (1) and (2) and without regard to this subparagraph) shall be reduced by—
Qualified offshore wind facilities
In general
In the case of any qualified offshore wind facility, subparagraph (E) shall not apply.
Qualified offshore wind facility
For purposes of this subparagraph, the term “qualified offshore wind facility” means a qualified facility (within the meaning of section 45) described in paragraph (1) of section 45(d) (determined without regard to any date by which the construction of the facility is required to begin) which is located in the inland navigable waters of the United States or in the coastal waters of the United States.
Phaseout for certain energy property
In the case of any qualified fuel cell property, qualified small wind property, or energy property described in clause (i) or clause (ii) of paragraph (3)(A) the construction of which begins after December 31, 2019, and which is placed in service before January 1, 2022, the energy percentage determined under paragraph (2) shall be equal to 26 percent.
Phaseout for certain energy property
In the case of any energy property described in clause (vii) of paragraph (3)(A), the energy percentage determined under paragraph (2) shall be equal to—
Interconnection property
In general
For purposes of determining the credit under subsection (a), energy property shall include amounts paid or incurred by the taxpayer for qualified interconnection property in connection with the installation of energy property (as defined in paragraph (3)) which has a maximum net output of not greater than 5 megawatts (as measured in alternating current), to provide for the transmission or distribution of the electricity produced or stored by such property, and which are properly chargeable to the capital account of the taxpayer.
Qualified interconnection property
The term “qualified interconnection property” means, with respect to an energy project which is not a microgrid controller, any tangible property—
either—
Interconnection agreement
The term “interconnection agreement” means an agreement with a utility for the purposes of interconnecting the energy property owned by such taxpayer to the transmission or distribution system of such utility.
Utility
For purposes of this paragraph, the term “utility” means the owner or operator of an electrical transmission or distribution system which is subject to the regulatory authority of a State or political subdivision thereof, any agency or instrumentality of the United States, a public service or public utility commission or other similar body of any State or political subdivision thereof, or the governing or ratemaking body of an electric cooperative.
Special rule for interconnection property
In the case of expenses paid or incurred for interconnection property, amounts otherwise chargeable to capital account with respect to such expenses shall be reduced under rules similar to the rules of section 50(c).
Increased credit amount for energy projects
In general
Rule
In the case of any energy project which satisfies the requirements of subparagraph (B), the amount of the credit determined under this subsection (determined after the application of paragraphs (1) through (8) and paragraph (15) and without regard to this clause) shall be equal to such amount multiplied by 5.
Energy project defined
For purposes of this subsection, the term “energy project” means a project consisting of one or more energy properties that are part of a single project.
Project requirements
A project meets the requirements of this subparagraph if it is one of the following:
Prevailing wage requirements
In general
The requirements described in this subparagraph with respect to any energy project are that the taxpayer shall ensure that any laborers and mechanics employed by the taxpayer or any contractor or subcontractor in—
Correction and penalty related to failure to satisfy wage requirements
Rules similar to the rules of section 45(b)(7)(B) shall apply.
Recapture
The Secretary shall, by regulations or other guidance, provide for recapturing the benefit of any increase in the credit allowed under this subsection by reason of this paragraph with respect to any project which does not satisfy the requirements under subparagraph (A) (after application of subparagraph (B)) for the period described in clause (ii) of subparagraph (A) (but which does not cease to be investment credit property within the meaning of section 50(a)). The period and percentage of such recapture shall be determined under rules similar to the rules of section 50(a).
Apprenticeship requirements
Rules similar to the rules of section 45(b)(8) shall apply.
Domestic content bonus credit amount
In general
In the case of any energy project which satisfies the requirement under subparagraph (B), for purposes of applying paragraph (2) with respect to such property, the energy percentage shall be increased by the applicable credit rate increase.
Requirement
Rules similar to the rules of section 45(b)(9)(B) shall apply.
Applicable credit rate increase
For purposes of subparagraph (A), the applicable credit rate increase shall be—
Phaseout for elective payment
In the case of a taxpayer making an election under section 6417 with respect to a credit under this section, rules similar to the rules of section 45(b)(10) shall apply.
Increase in credit rate for energy communities
In general
In the case of any energy project that is placed in service within an energy community (as defined in section 45(b)(11)(B), as applied by substituting “energy project” for “qualified facility” each place it appears), for purposes of applying paragraph (2) with respect to energy property which is part of such project, the energy percentage shall be increased by the applicable credit rate increase.
Applicable credit rate increase
For purposes of subparagraph (A), the applicable credit rate increase shall be equal to—
Election to treat clean hydrogen production facilities as energy property
In general
In the case of any qualified property (as defined in paragraph (5)(D)) which is part of a specified clean hydrogen production facility—
the energy percentage with respect to such property is—
Denial of production credit
No credit shall be allowed under section 45V or section 45Q for any taxable year with respect to any specified clean hydrogen production facility or any carbon capture equipment included at such facility.
Specified clean hydrogen production facility
For purposes of this paragraph, the term “specified clean hydrogen production facility” means any qualified clean hydrogen production facility (as defined in section 45V(c)(3))—
with respect to which—
Qualified clean hydrogen
For purposes of this paragraph, the term “qualified clean hydrogen” has the meaning given such term by section 45V(c)(2).
Regulations
The Secretary shall issue such regulations or other guidance as the Secretary determines necessary to carry out the purposes of this section, including regulations or other guidance which recaptures so much of any credit allowed under this section as exceeds the amount of the credit which would have been allowed if the expected production were consistent with the actual verified production (or all of the credit so allowed in the absence of such verification).
Regulations and guidance
The Secretary shall issue such regulations or other guidance as the Secretary determines necessary to carry out the purposes of this subsection, including regulations or other guidance which provides for requirements for recordkeeping or information reporting for purposes of administering the requirements of this subsection.
Certain progress expenditure rules made applicable
Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the date of the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of subsection (a).
Definitions
For purposes of this section—
Qualified fuel cell property
In general
The term “qualified fuel cell property” means a fuel cell power plant which—
Limitation
In the case of qualified fuel cell property placed in service during the taxable year, the credit otherwise determined under subsection (a) for such year with respect to such property shall not exceed an amount equal to $1,500 for each 0.5 kilowatt of capacity of such property.
Fuel cell power plant
The term “fuel cell power plant” means an integrated system comprised of a fuel cell stack assembly, or linear generator assembly, and associated balance of plant components which converts a fuel into electricity using electrochemical or electromechanical means.
Linear generator assembly
The term “linear generator assembly” does not include any assembly which contains rotating parts.
Termination
The term “qualified fuel cell property” shall not include any property the construction of which does not begin before January 1, 2025.
Qualified microturbine property
In general
The term “qualified microturbine property” means a stationary microturbine power plant which—
Limitation
In the case of qualified microturbine property placed in service during the taxable year, the credit otherwise determined under subsection (a) for such year with respect to such property shall not exceed an amount equal to $200 for each kilowatt of capacity of such property.
Stationary microturbine power plant
The term “stationary microturbine power plant” means an integrated system comprised of a gas turbine engine, a combustor, a recuperator or regenerator, a generator or alternator, and associated balance of plant components which converts a fuel into electricity and thermal energy. Such term also includes all secondary components located between the existing infrastructure for fuel delivery and the existing infrastructure for power distribution, including equipment and controls for meeting relevant power standards, such as voltage, frequency, and power factors.
Termination
The term “qualified microturbine property” shall not include any property the construction of which does not begin before January 1, 2025.
Combined heat and power system property
Combined heat and power system property
The term “combined heat and power system property” means property comprising a system—
which produces—
Limitation
In general
In the case of combined heat and power system property with an electrical capacity in excess of the applicable capacity placed in service during the taxable year, the credit under subsection (a)(1) (determined without regard to this paragraph) for such year shall be equal to the amount which bears the same ratio to such credit as the applicable capacity bears to the capacity of such property.
Applicable capacity
For purposes of clause (i), the term “applicable capacity” means 15 megawatts or a mechanical energy capacity of more than 20,000 horsepower or an equivalent combination of electrical and mechanical energy capacities.
Maximum capacity
The term “combined heat and power system property” shall not include any property comprising a system if such system has a capacity in excess of 50 megawatts or a mechanical energy capacity in excess of 67,000 horsepower or an equivalent combination of electrical and mechanical energy capacities.
Special rules
Energy efficiency percentage
For purposes of this paragraph, the energy efficiency percentage of a system is the fraction—
Determinations made on Btu basis
The energy efficiency percentage and the percentages under subparagraph (A)(ii) shall be determined on a Btu basis.
Input and output property not included
The term “combined heat and power system property” does not include property used to transport the energy source to the facility or to distribute energy produced by the facility.
Systems using biomass
If a system is designed to use biomass (within the meaning of paragraphs (2) and (3) of section 45(c) without regard to the last sentence of paragraph (3)(A)) for at least 90 percent of the energy source—
Qualified small wind energy property
In general
The term “qualified small wind energy property” means property which uses a qualifying small wind turbine to generate electricity.
Qualifying small wind turbine
The term “qualifying small wind turbine” means a wind turbine which has a nameplate capacity of not more than 100 kilowatts.
Termination
The term “qualified small wind energy property” shall not include any property the construction of which does not begin before January 1, 2025.
Waste energy recovery property
In general
The term “waste energy recovery property” means property that generates electricity solely from heat from buildings or equipment if the primary purpose of such building or equipment is not the generation of electricity.
Capacity limitation
The term “waste energy recovery property” shall not include any property which has a capacity in excess of 50 megawatts.
No double benefit
Any waste energy recovery property (determined without regard to this subparagraph) which is part of a system which is a combined heat and power system property shall not be treated as waste energy recovery property for purposes of this section unless the taxpayer elects to not treat such system as a combined heat and power system property for purposes of this section.
Termination
The term “waste energy recovery property” shall not include any property the construction of which does not begin before January 1, 2025.
Energy storage technology
In general
The term “energy storage technology” means—
Modifications of certain property
In the case of any property which either—
Thermal energy storage property
In general
Subject to clause (ii), for purposes of this paragraph, the term “thermal energy storage property” means property comprising a system which—
Exclusion
The term “thermal energy storage property” shall not include—
Termination
The term “energy storage technology” shall not include any property the construction of which begins after December 31, 2024.
Qualified biogas property
In general
The term “qualified biogas property” means property comprising a system which—
converts biomass (as defined in section 45K(c)(3), as in effect on the date of enactment of this paragraph) into a gas which—
Inclusion of cleaning and conditioning property
The term “qualified biogas property” includes any property which is part of such system which cleans or conditions such gas.
Termination
The term “qualified biogas property” shall not include any property the construction of which begins after December 31, 2024.
Microgrid controller
In general
The term “microgrid controller” means equipment which is—
Qualified microgrid
The term “qualified microgrid” means an electrical system which—
is capable of operating—
Termination
The term “microgrid controller” shall not include any property the construction of which begins after December 31, 2024.
Coordination with Department of Treasury grants
In the case of any property with respect to which the Secretary makes a grant under section 1603 of the American Recovery and Reinvestment Tax Act of 2009—
Denial of production and investment credits
No credit shall be determined under this section or section 45 with respect to such property for the taxable year in which such grant is made or any subsequent taxable year.
Recapture of credits for progress expenditures made before grant
If a credit was determined under this section with respect to such property for any taxable year ending before such grant is made—
Treatment of grants
Any such grant—
Special rules for certain solar and wind facilities placed in service in connection with low-income communities
In general
In the case of any qualified solar and wind facility with respect to which the Secretary makes an allocation of environmental justice solar and wind capacity limitation under paragraph (4)—
the energy percentage otherwise determined under paragraph (2) or (5) of subsection (a) with respect to any eligible property which is part of such facility shall be increased by—
the increase in the credit determined under subsection (a) by reason of this subsection for any taxable year with respect to all property which is part of such facility shall not exceed the amount which bears the same ratio to the amount of such increase (determined without regard to this subparagraph) as—
Qualified solar and wind facility
For purposes of this subsection—
In general
The term “qualified solar and wind facility” means any facility—
which—
Qualified low-income residential building project
A facility shall be treated as part of a qualified low-income residential building project if—
Qualified low-income economic benefit project
A facility shall be treated as part of a qualified low-income economic benefit project if at least 50 percent of the financial benefits of the electricity produced by such facility are provided to households with income of—
Financial benefit
For purposes of subparagraphs (B) and (C), electricity acquired at a below-market rate shall not fail to be taken into account as a financial benefit.
Eligible property
For purposes of this section, the term “eligible property” means energy property which—
Allocations
In general
Not later than 180 days after the date of enactment of this subsection, the Secretary shall establish a program to allocate amounts of environmental justice solar and wind capacity limitation to qualified solar and wind facilities. In establishing such program and to carry out the purposes of this subsection, the Secretary shall provide procedures to allow for an efficient allocation process, including, when determined appropriate, consideration of multiple projects in a single application if such projects will be placed in service by a single taxpayer.
Limitation
The amount of environmental justice solar and wind capacity limitation allocated by the Secretary under subparagraph (A) during any calendar year shall not exceed the annual capacity limitation with respect to such year.
Annual capacity limitation
For purposes of this paragraph, the term “annual capacity limitation” means 1.8 gigawatts of direct current capacity for each of calendar years 2023 and 2024, and zero thereafter.
Carryover of unused limitation
If the annual capacity limitation for any calendar year exceeds the aggregate amount allocated for such year under this paragraph, such limitation for the succeeding calendar year shall be increased by the amount of such excess. No amount may be carried under the preceding sentence to any calendar year after 2024 except as provided in section 48E(h)(4)(D)(ii).
Placed in service deadline
In general
Paragraph (1) shall not apply with respect to any property which is placed in service after the date that is 4 years after the date of the allocation with respect to the facility of which such property is a part.
Application of carryover
Any amount of environmental justice solar and wind capacity limitation which expires under clause (i) during any calendar year shall be taken into account as an excess described in subparagraph (D) (or as an increase in such excess) for such calendar year, subject to the limitation imposed by the last sentence of such subparagraph.
Recapture
The Secretary shall, by regulations or other guidance, provide for recapturing the benefit of any increase in the credit allowed under subsection (a) by reason of this subsection with respect to any property which ceases to be property eligible for such increase (but which does not cease to be investment credit property within the meaning of section 50(a)). The period and percentage of such recapture shall be determined under rules similar to the rules of section 50(a). To the extent provided by the Secretary, such recapture may not apply with respect to any property if, within 12 months after the date the taxpayer becomes aware (or reasonably should have become aware) of such property ceasing to be property eligible for such increase, the eligibility of such property for such increase is restored. The preceding sentence shall not apply more than once with respect to any facility.
(Added Pub. L. 87–834, § 2(b), Oct. 16, 1962, 76 Stat. 967; amended Pub. L. 88–272, title II, § 203(a)(1), (3)(A), (b), (c), Feb. 26, 1964, 78 Stat. 33, 34; Pub. L. 89–800, § 1 Nov. 8, 1966, 80 Stat. 1508; Pub. L. 89–809, title II, § 201(a), Nov. 13, 1966, 80 Stat. 1575; Pub. L. 90–26, §§ 1, 2(a), 3, June 13, 1967, 81 Stat. 57, 58; Pub. L. 91–172, title I, § 121(d)(2)(A), title IV, § 401(e)(2)–(4), Dec. 30, 1969, 83 Stat. 547, 603; Pub. L. 92–178, title I, §§ 102(a)(2), 103, 104(a)(1), (b)–(f)(1), (g), 108(b), (c), Dec. 10, 1971, 85 Stat. 499–502, 507; Pub. L. 94–12, title III, §§ 301(c)(1), 302(c)(3), title VI, § 604(a), Mar. 29, 1975, 89 Stat. 38, 44, 65; Pub. L. 94–455, title VIII, §§ 802(b)(6), 804(a), title X, § 1051(h)(1), title XIX, §§ 1901(a)(5), (b)(11)(A), 1906(b)(13)(A), title XXI, § 2112(a)(1), Oct. 4, 1976, 90 Stat. 1583, 1591, 1647, 1764, 1795, 1834, 1905; Pub. L. 95–473, § 2(a)(2)(A), Oct. 17, 1978, 92 Stat. 1464; Pub. L. 95–600, title I, § 141(b), title III, §§ 312(c)(1)–(3), 314(a), (b), 315(a)–(c), title VII, § 703(a)(3), (4), Nov. 6, 1978, 92 Stat. 2791, 2826–2829, 2939; Pub. L. 95–618, title III, § 301(b), (d)(1), (2), Nov. 9, 1978, 92 Stat. 3195, 3199, 3200; Pub. L. 96–222, title I, §§ 101(a)(7)(G), (H), (L)(i)(I)–(IV), (ii)(III)–(VI), (iii)(II), (III), (v)(II)–(V), (M)(ii), (iii), 103(a)(2)(A), (4)(B), 108(c)(6), Apr. 1, 1980, 94 Stat. 198–201, 208, 209, 228; Pub. L. 96–223, title II, §§ 221(b), 222(a)–(e)(1), (f)–(i), 223(a)(1), (c)(1), Apr. 2, 1980, 94 Stat. 261–266; Pub. L. 96–451, title III, § 302(a), Oct. 14, 1980, 94 Stat. 1991; Pub. L. 96–605, title I, § 109(a), title II, § 223(a), Dec. 28, 1980, 94 Stat. 3525, 3528; Pub. L. 97–34, title II, §§ 211(a)(2), (c), (e)(3), (4), (h), 212(a)(3), (b), (c), (d)(2)(A), 213(a), 214(a), (b), title III, § 332(b), Aug. 13, 1981, 95 Stat. 227–229, 235, 236, 239, 240, 296; Pub. L. 97–248, title II, §§ 205(a)(1), (4), (5)(A), 209(c), Sept. 3, 1982, 96 Stat. 427, 429, 447; Pub. L. 97–354, §§ 3(d), 5(a)(7), (8), Oct. 19, 1982, 96 Stat. 1689, 1692; Pub. L. 97–362, title I, § 104(a), Oct. 25, 1982, 96 Stat. 1729; Pub. L. 97–424, title V, § 546(a), Jan. 6, 1983, 96 Stat. 2198; Pub. L. 97–448, title I, § 102(e)(2)(A), (f)(2), (3), (6), title II, § 202(c), title III, § 306(a)(3), Jan. 12, 1983, 96 Stat. 2371, 2372, 2396, 2400; Pub. L. 98–369, div. A, title I, §§ 11, 31(b), (c), 111(e)(8), 113(a)(1), (b)(3), (4), 114(a), title IV, §§ 431(c), 474(o)(10)–(18), title VII, §§ 712(b), 721(x)(1), 735(c)(1), title X, § 1043(a), July 18, 1984, 98 Stat. 503, 517, 518, 633, 635, 637, 638, 808, 836, 837, 946, 971, 981, 1044; Pub. L. 99–121, title I, § 103(b)(5), Oct. 11, 1985, 99 Stat. 510; Pub. L. 99–514, title II, § 251(b), (c), title VII, § 701(e)(4)(C), title VIII, § 803(b)(2)(B), title XII, §§ 1272(d)(5), 1275(c)(5), title XV, § 1511(c)(3), title XVIII, §§ 1802(a)(4)(C), (5)(B), (9)(A), (B), 1809(d)(2), (e), 1847(b)(6), 1879(j)(1), Oct. 22, 1986, 100 Stat. 2184, 2186, 2343, 2355, 2594, 2599, 2745, 2788, 2789, 2821, 2856, 2908; Pub. L. 100–647, title I, §§ 1002(a)(14), (16)(A), (20), (29), (30), 1013(a)(41), Nov. 10, 1988, 102 Stat. 3355–3357, 3544; Pub. L. 101–508, title XI, §§ 11801(c)(6)(A), 11813(a), Nov. 5, 1990, 104 Stat. 1388–523, 1388–541; Pub. L. 102–227, title I, § 106, Dec. 11, 1991, 105 Stat. 1687; Pub. L. 102–486, title XIX, § 1916(a), Oct. 24, 1992, 106 Stat. 3024; Pub. L. 108–357, title III, § 322(d)(2)(A), (B), title VII, § 710(e), Oct. 22, 2004, 118 Stat. 1475, 1557; Pub. L. 109–58, title XIII, §§ 1336(a)–(d), 1337(a)–(c), Aug. 8, 2005, 119 Stat. 1036–1038; Pub. L. 109–135, title IV, § 412(m), (n), Dec. 21, 2005, 119 Stat. 2638; Pub. L. 109–432, div. A, title II, § 207, Dec. 20, 2006, 120 Stat. 2945; Pub. L. 110–172, § 11(a)(8), (9), Dec. 29, 2007, 121 Stat. 2485; Pub. L. 110–343, div. B, title I, §§ 103(a), (c)–(e), 104(a)–(d), 105(a), Oct. 3, 2008, 122 Stat. 3811, 3813, 3814; Pub. L. 111–5, div. B, title I, §§ 1102(a), 1103(a), (b)(1), 1104, Feb. 17, 2009, 123 Stat. 319–321; Pub. L. 112–240, title IV, § 407(b), (c)(1), Jan. 2, 2013, 126 Stat. 2341; Pub. L. 113–295, div. A, title I, § 155(b), title II, § 209(d), Dec. 19, 2014, 128 Stat. 4021, 4028; Pub. L. 114–113, div. P, title III, §§ 302(a), (b), 303(a)–(c), div. Q, title I, § 187(b), Dec. 18, 2015, 129 Stat. 3038, 3039, 3074; Pub. L. 115–123, div. D, title I, §§ 40409(b), 40411(a)–(f), Feb. 9, 2018, 132 Stat. 150, 151; Pub. L. 115–141, div. U, title IV, § 401(a)(20)–(23), (350), Mar. 23, 2018, 132 Stat. 1185, 1201; Pub. L. 116–94, div. Q, title I, § 127(b), (c)(2)(B), Dec. 20, 2019, 133 Stat. 3232; Pub. L. 116–260, div. EE, title I, §§ 131(b), (c)(2), 132(a), (b), title II, §§ 203(a)–(d), 204(a), Dec. 27, 2020, 134 Stat. 3052, 3057; Pub. L. 117–169, title I, §§ 13101(d), (e)(2)(B), (3), 13102(a)–(f)(3), (g), (h), (j)–(m), (o), (p), 13103(a), 13204(c)(1), (2), Aug. 16, 2022, 136 Stat. 1906, 1913–1915, 1917, 1918, 1920, 1921, 1940, 1941; Pub. L. 119–21, title VII, § 70513(e), July 4, 2025, 139 Stat. 273.)