U.S. Code · Título 33
ECOSYSTEM RESTORATION AUTHORIZATION.
33 U.S.C. § 8004
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Operation.—
To ensure the environmental sustainability of the existing Upper Mississippi River and Illinois Waterway System, the Secretary [of the Army] shall modify, consistent with requirements to avoid adverse effects on navigation, the operation of the Upper Mississippi River and Illinois Waterway System to address the cumulative environmental impacts of operation of the system and improve the ecological integrity of the Upper Mississippi River and Illinois River.Ecosystem Restoration Projects.—
In general.—
The Secretary [of the Army] shall carry out, consistent with requirements to avoid adverse effects on navigation, ecosystem restoration projects to attain and maintain the sustainability of the ecosystem of the Upper Mississippi River and Illinois River in accordance with the general framework outlined in the Plan.Projects included.—
Ecosystem restoration projects may include—
Cost sharing.—
In general.—
Except as provided in subparagraphs (B) and (C), the Federal share of the cost of carrying out an ecosystem restoration project under this subsection shall be 65 percent.Exception for certain restoration projects.—
In the case of a project under this section for ecosystem restoration, the Federal share of the cost of carrying out the project shall be 100 percent if the project—
Savings clause.—
Nothing in this subsection affects the applicability of section 906(e) of the Water Resources Development Act of 1986 (33 U.S.C. 2283(e)).Nongovernmental organizations.—
In accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b), for any project carried out under this title, a non-Federal sponsor may include a nonprofit entity, with the consent of the affected local government.Land acquisition.—
The Secretary [of the Army] may acquire land or an interest in land for an ecosystem restoration project from a willing seller through conveyance of—
Monitoring.—
The Secretary [of the Army] shall carry out a long term resource monitoring, computerized data inventory and analysis, and applied research program for the Upper Mississippi River and Illinois River to determine trends in ecosystem health, to understand systemic changes, and to help identify restoration needs. The program shall consider and adopt the monitoring program established under section 1103(e)(1)(A)(ii) of the Water Resources Development Act of 1986 (33 U.S.C. 652(e)(1)(A)(ii)).Ecosystem Restoration Preconstruction Engineering and Design.—
Restoration design.—
Before initiating the construction of any individual ecosystem restoration project, the Secretary [of the Army] shall—
Outcomes.—
Performance measures identified under paragraph (1)(A) shall include specific measurable environmental outcomes, such as changes in water quality, hydrology, or the well-being of indicator species the population and distribution of which are representative of the abundance and diversity of ecosystem-dependent aquatic and terrestrial species.Restoration design.—
Restoration design carried out as part of ecosystem restoration shall include a monitoring plan for the performance measures identified under paragraph (1)(A), including—
Consultation and Funding Agreements.—
In general.—
In carrying out the environmental sustainability, ecosystem restoration, and monitoring activities authorized in this section, the Secretary [of the Army] shall consult with the Secretary of the Interior and the States of Illinois, Iowa, Minnesota, Missouri, and Wisconsin.Funding agreements.—
The Secretary is authorized to enter into agreements with the Secretary of the Interior, the Upper Mississippi River Basin Association, and natural resource and conservation agencies of the States of Illinois, Iowa, Minnesota, Missouri, and Wisconsin to provide for the direct participation of and transfer of funds to such entities for the planning, implementation, and evaluation of projects and programs established by this section.Specific Projects Authorization.—
In general.—
There is authorized to be appropriated to carry out this subsection $1,717,000,000, of which not more than $245,000,000 shall be available for projects described in subsection (b)(2)(B) and not more than $48,000,000 shall be available for projects described in subsection (b)(2)(J). Such sums shall remain available until expended.Limitation on available funds.—
Of the amounts made available under paragraph (1), not more than $35,000,000 in any fiscal year may be used for land acquisition under subsection (b)(4).Individual project limit.—
Other than for projects described in subparagraphs (B) and (J) of subsection (b)(2), the total cost of any single project carried out under this subsection shall not exceed $25,000,000.Monitoring.—
In addition to amounts authorized under paragraph (1), there are authorized $10,420,000 per fiscal year to carry out the monitoring program under subsection (c) if such sums are not appropriated pursuant to section 1103(e)(4) the Water Resources Development Act of 1986 (33 U.S.C. 652(e)(4)).Implementation Reports.—
In general.—
Not later than June 30, 2009, and every 4 years thereafter, the Secretary [of the Army] shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an implementation report that—
Advisory panel.—
In general.—
The Secretary shall appoint and convene an advisory panel to provide independent guidance in the development of each implementation report under paragraph (1).Panel members.—
Panel members shall include—