40 U.S.C. § 3307
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Resolutions Required Before Appropriations May Be Made.—
The following appropriations may be made only if the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives adopt resolutions approving the purpose for which the appropriation is made:
Transmission to Congress of Prospectus of Proposed Project.—
To secure consideration for the approval referred to in subsection (a), the Administrator of General Services (referred to in this section as the “Administrator”) shall transmit to Congress a prospectus of the proposed facility, including—
Increase of Estimated Maximum Cost.—
The estimated maximum cost of any project approved under this section as set forth in any prospectus may be increased by an amount equal to any percentage increase, as determined by the Administrator, in construction or alteration costs from the date the prospectus is transmitted to Congress. The increase authorized by this subsection may not exceed 10 percent of the estimated maximum cost. The Administrator shall notify, in writing, the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of any increase of more than 5 percent of an estimated maximum cost or of any increase or decrease in the scope or size of a project of 5 or more percent. Such notification shall include an explanation regarding any such increase or decrease. The scope or size of a project shall not increase or decrease by more than 10 percent unless an amended prospectus is submitted and approved pursuant to this section.Rescission of Approval.—
If an appropriation is not made within one year after the date a project for construction, alteration, or acquisition is approved under subsection (a), the Committee on Environment and Public Works of the Senate or the Committee on Transportation and Infrastructure of the House of Representatives by resolution may rescind its approval before an appropriation is made.Emergency Leases by the Administrator.—
This section does not prevent the Administrator from entering into emergency leases during any period declared by the President to require emergency leasing authority. An emergency lease may not be for more than 180 days without approval of a prospectus for the lease in accordance with subsection (a).Minimum Performance Requirements for Leased Space.—
With respect to space to be leased, the Administrator shall include, to the maximum extent practicable, minimum performance requirements requiring energy efficiency and the use of renewable energy.Limitation on Leasing Certain Space.—
In general.—
The Administrator may not lease space to accommodate any of the following if the average rental cost of leasing the space will exceed $1,500,000:
Exception.—
The Administrator may lease space with respect to which paragraph (1) applies if the Administrator—
Dollar Amount Adjustment.—
The Administrator annually may adjust any dollar amount referred to in this section to reflect a percentage increase or decrease in construction costs during the prior calendar year, as determined by the composite index of construction costs of the Department of Commerce. Any adjustment shall be expeditiously reported to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives.Notification Required.—
For each project approved under this section, the Administrator shall notify, in writing, the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of any project milestones that are accomplished, including—
Expiration of Committee Resolutions.—
In general.—
Unless a lease is awarded or a construction, alteration, repair, design, or acquisition project is initiated not later than 5 years after the resolution approvals adopted by the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate pursuant to subsection (a), the resolutions shall be deemed expired.Application.—
This subsection shall only apply to resolutions approved after the date of enactment of this subsection.(Pub. L. 107–217, Aug. 21, 2002, 116 Stat. 1161; Pub. L. 110–140, title III, § 323(a), (b), Dec. 19, 2007, 121 Stat. 1589, 1590; Pub. L. 114–287, § 17, Dec. 16, 2016, 130 Stat. 1476; Pub. L. 118–272, div. B, title III, §§ 2304(a), (c), (f), 2310, Jan. 4, 2025, 138 Stat. 3223, 3224, 3227.)