U.S. Code · Título 42
Cost-effective technology acceleration program
42 U.S.C. § 17095
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Definition of Administrator
In this section, the term “Administrator” means the Administrator of General Services.
Establishment
In general
The Administrator shall establish a program to accelerate the use of more cost-effective technologies and practices at GSA facilities.
Requirements
The program established under this subsection shall—
Accelerated use of technologies
Review
In general
As part of the program under this section, not later than 90 days after December 19, 2007, the Administrator shall conduct a review of—
Requirements
The review under subparagraph (A) shall—
Replacement
In general
As part of the program under this section, not later than 180 days after December 19, 2007, the Administrator shall establish, using available appropriations and programs implementing sections 432 and 525 1 (and amendments made by those sections), a cost-effective lighting technology and geothermal heat pump technology acceleration program to achieve maximum feasible replacement of existing lighting, heating, cooling 2 technologies with cost-effective lighting technologies and geothermal heat pump technologies in each GSA facility. Such program shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 1 and amendments made by those sections and any other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy savings than required by this section.
Acceleration plan timetable
In general
To implement the program established under subparagraph (A), not later than 1 year after December 19, 2007, the Administrator shall establish a timetable of actions to comply with the requirements of this section and sections 431 through 435, whichever achieves greater energy savings most expeditiously, including milestones for specific activities needed to replace existing lighting, heating, cooling 2 technologies with cost-effective lighting technologies and geothermal heat pump technologies, to the maximum extent feasible (including at the maximum rate feasible), at each GSA facility.
Goal
The goal of the timetable under clause (i) shall be to complete, using available appropriations and programs implementing sections 431 through 435 1 (and amendments made by those sections), maximum feasible replacement of existing lighting, heating, and cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies consistent with the requirements of this section and sections 431 through 435,1 whichever achieves greater energy savings most expeditiously. Notwithstanding any provision of this section, such program shall fully comply with the requirements of the Act 3 including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections and other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section.
GSA facility technologies and practices
In general
Not later than 180 days after December 19, 2007, and annually thereafter, the Administrator shall—
Measures
The plan shall implement measures required by such other provisions of law in accordance with those provisions, and shall implement the measures required by this section to the maximum extent feasible (including at the maximum rate feasible) using available appropriations and programs implementing sections 431 through 435 and 525 1 (and amendments made by those sections), by not later than the date that is 5 years after December 19, 2007.
Contents of plan
The plan shall—
with respect to cost-effective technologies and practices—
describe the status of the implementation of cost-effective technologies and practices at GSA facilities, including—
in coordination with the Office of Management and Budget, review the budget process for capital programs with respect to alternatives for—
Administration
Notwithstanding any provision of this section, the program required under this section shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 1 and amendments made by those sections, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section.
Authorization of appropriations
There are authorized to be appropriated such sums as are necessary to carry out this section, to remain available until expended.
(Pub. L. 110–140, title IV, § 439, Dec. 19, 2007, 121 Stat. 1620.)