U.S. Code · Título 42
Data collection in the electricity sector
42 U.S.C. § 18772
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Dashboard
Establishment
In general
Not later than 90 days after November 15, 2021, the Administrator shall establish an online database to track the operation of the bulk power system in the contiguous 48 States (referred to in this section as the “Dashboard”).
Improvement of existing dashboard
The Dashboard may be established through the improvement, in accordance with this subsection, of an existing dashboard of the Energy Information Administration, such as—
Expansion
In general
Not later than 1 year after November 15, 2021, the Administrator shall expand the Dashboard to include, to the maximum extent practicable, hourly operating data collected from the electricity balancing authorities that operate the bulk power system in all of the several States, each territory of the United States, and the District of Columbia.
Types of data
The hourly operating data collected under subparagraph (A) may include data relating to—
where available, the estimated marginal greenhouse gas emissions per megawatt hour of electricity generated—
Mix of energy sources
In general
Not later than 1 year after November 15, 2021, the Administrator shall establish, in accordance with section 18777 of this title and this subsection and to the extent the Administrator determines to be appropriate, a system to harmonize the operating data on electricity generation collected under subsection (a) with—
Outcomes
The system established under paragraph (1) shall result in an integrated dataset that includes, for any given time—
Real-time data dissemination
To the maximum extent practicable, the system established under paragraph (1) shall disseminate data—
Complementary efforts
The system established under paragraph (1) shall complement any existing data dissemination efforts of the Administrator that make use of electricity generation data, such as electricity demand by subregion and electricity interchange with directly interconnected balancing authorities.
Observed characteristics of bulk power system resource integration
In general
Not later than 1 year after November 15, 2021, the Administrator shall establish a system to provide to the public timely data on the integration of energy resources into the bulk power system and the electric distribution grids in the United States, and the observed effects of that integration.
Requirements
In carrying out paragraph (1), the Administrator shall seek to improve the temporal and spatial resolution of data relating to how grid operations are changing, such as through—
improvements in real-time—
Distribution system operations
In general
Not later than 1 year after November 15, 2021, the Administrator shall establish a system to provide to the public timely data on the operations of load-serving entities in the electricity grids of the United States.
Requirements
In general
In carrying out paragraph (1), the Administrator shall—
not less frequently than annually, provide data on—
Data on the delivered generation resource mix
In collecting the data described in subparagraph (A)(i)(I), the Administrator shall—
(Pub. L. 117–58, div. D, title IV, § 40412, Nov. 15, 2021, 135 Stat. 1039.)