U.S. Code · Título 42
Long-term storage
42 U.S.C. § 6939f
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Designation of facility
In general
Not later than January 1, 2010, the Secretary of Energy (referred to in this section as the “Secretary”) shall designate a facility or facilities of the Department of Energy, which shall not include the Y–12 National Security Complex or any other portion or facility of the Oak Ridge Reservation of the Department of Energy, for the purpose of long-term management and storage of elemental mercury generated within the United States.
Operation of facility
Not later than January 1, 2019, the facility designated in paragraph (1) shall be operational and shall accept custody, for the purpose of long-term management and storage, of elemental mercury generated within the United States and delivered to such facility.
Fees
In general
Assessment and collection
After consultation with persons who are likely to deliver elemental mercury to a designated facility for long-term management and storage under the program prescribed in subsection (a), and with other interested persons, the Secretary shall assess and collect a fee at the time of delivery for providing such management and storage, based on the pro rata cost of long-term management and storage of elemental mercury delivered to the facility.
Amount
The amount of the fees described in subparagraph (A)—
Conveyance of title and permitting
If the facility designated in subsection (a) is not operational by January 1, 2020, the Secretary—
Costs
The costs referred to in paragraph (1)(B)(iii) are the costs to the Department of Energy of providing such management and storage, including facility operation and maintenance, security, monitoring, reporting, personnel, administration, inspections, training, fire suppression, closure, and other costs required for compliance with applicable law. Such costs shall not include costs associated with land acquisition or permitting of a designated facility under the Solid Waste Disposal Act [42 U.S.C. 6901 et seq.] or other applicable law. Building design and building construction costs shall only be included to the extent that the Secretary finds that the management and storage of elemental mercury accepted under the program under this section cannot be accomplished without construction of a new building or buildings.
Report
Not later than 60 days after the end of each Federal fiscal year, the Secretary shall transmit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on all of the costs incurred in the previous fiscal year associated with the long-term management and storage of elemental mercury. Such report shall set forth separately the costs associated with activities taken under this section.
Management standards for a facility
Guidance
Not later than October 1, 2009, the Secretary, after consultation with the Administrator of the Environmental Protection Agency and all appropriate State agencies in affected States, shall make available, including to potential users of the long-term management and storage program established under subsection (a), guidance that establishes procedures and standards for the receipt, management, and long-term storage of elemental mercury at a designated facility or facilities, including requirements to ensure appropriate use of flasks or other suitable shipping containers. Such procedures and standards shall be protective of human health and the environment and shall ensure that the elemental mercury is stored in a safe, secure, and effective manner. In addition to such procedures and standards, elemental mercury managed and stored under this section at a designated facility shall be subject to the requirements of the Solid Waste Disposal Act [42 U.S.C. 6901 et seq.], including the requirements of subtitle C of that Act [42 U.S.C. 6921 et seq.], except as provided in subsection (g)(2) of this section. A designated facility is authorized to operate under interim status pursuant to section 3005(e) of the Solid Waste Disposal Act [42 U.S.C. 6925(e)] until a final decision on a permit application is made pursuant to section 3005(c) of the Solid Waste Disposal Act [42 U.S.C. 6925(c)]. Not later than January 1, 2020, the Administrator of the Environmental Protection Agency (or an authorized State) shall issue a final decision on the permit application.
Training
The Secretary shall conduct operational training and emergency training for all staff that have responsibilities related to elemental mercury management, transfer, storage, monitoring, or response.
Equipment
The Secretary shall ensure that each designated facility has all equipment necessary for routine operations, emergencies, monitoring, checking inventory, loading, and storing elemental mercury at the facility.
Fire detection and suppression systems
The Secretary shall—
Indemnification of persons delivering elemental mercury
In general
Conditions
No indemnification may be afforded under this subsection unless the person seeking indemnification—
Authority of Secretary
Terms, conditions, and procedures
The Secretary is authorized to establish such terms, conditions, and procedures as are necessary to carry out this section.
Effect on other law
In general
Except as provided in paragraph (2), nothing in this section changes or affects any Federal, State, or local law or the obligation of any person to comply with such law.
Exception
Elemental mercury may be stored at a facility with respect to which any permit has been issued under section 3005(c) of the Solid Waste Disposal Act (42 U.S.C. 6925(c)), and shall not be subject to the storage prohibition of section 3004(j) of the Solid Waste Disposal Act (42 U.S.C. 6924(j)) if—
A generator producing elemental mercury incidentally from the beneficiation or processing of ore or related pollution control activities may accumulate the mercury produced onsite that is destined for a facility designated by the Secretary under subsection (a) for more than 90 days without a permit issued under section 3005(c) of the Solid Waste Disposal Act (42 U.S.C. 6925(c)), and shall not be subject to the storage prohibition of section 3004(j) of that Act (42 U.S.C. 6924(j)), if—
Management standards for temporary storage.—
Not later than January 1, 2017, the Secretary, after consultation with the Administrator of the Environmental Protection Agency and State agencies in affected States, shall develop and make available guidance that establishes procedures and standards for the management and short-term storage of elemental mercury at a generator covered under subparagraph (D), including requirements to ensure appropriate use of flasks or other suitable containers. Such procedures and standards shall be protective of health and the environment and shall ensure that the elemental mercury is stored in a safe, secure, and effective manner. A generator may accumulate mercury in accordance with subparagraph (D) immediately upon enactment of this subparagraph, and notwithstanding that guidance called for by this paragraph has not been developed or made available.Study
Not later than July 1, 2014, the Secretary shall transmit to the Congress the results of a study, conducted in consultation with the Administrator of the Environmental Protection Agency, that—
(Pub. L. 110–414, § 5, Oct. 14, 2008, 122 Stat. 4344; Pub. L. 114–182, title I, § 10(c), (d), June 22, 2016, 130 Stat. 478, 480.)