42 U.S.C. § 9616
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Assessment and listing of facilities
It shall be a goal of this chapter that, to the maximum extent practicable—
Evaluation
Within 4 years after October 17, 1986, each facility listed (as of October 17, 1986) in the CERCLIS shall be evaluated if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment. The evaluation shall be in accordance with the criteria established in section 9605 of this title under the National Contingency Plan for determining priorities among release for inclusion on the National Priorities List. In the case of a facility listed in the CERCLIS after October 17, 1986, the facility shall be evaluated within 4 years after the date of such listing if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment.
Explanations
If any of the goals established by subsection (a) or (b) are not achieved, the President shall publish an explanation of why such action could not be completed by the specified date.
Commencement of RI/FS
The President shall assure that remedial investigations and feasibility studies (RI/FS) are commenced for facilities listed on the National Priorities List, in addition to those commenced prior to October 17, 1986, in accordance with the following schedule:
Commencement of remedial action
The President shall assure that substantial and continuous physical on-site remedial action commences at facilities on the National Priorities List, in addition to those facilities on which remedial action has commenced prior to October 17, 1986, at a rate not fewer than:
(Pub. L. 96–510, title I, § 116, as added Pub. L. 99–499, title I, § 116, Oct. 17, 1986, 100 Stat. 1653.)