U.S. Code · Título 43
Feasibility studies
43 U.S.C. § 2405
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
In general
On completion of an appraisal report under section 2404(c) of this title that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall—
receive and review a feasibility study that is—
provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that—
Review of non-Federal feasibility studies
In general
In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall—
Revisions
If the Secretary determines under paragraph (1)(B) that a feasibility study is not complete, the non-Federal entity shall pay any costs associated with revising the feasibility study.
Feasibility factors
Feasibility studies authorized or reviewed under this subchapter shall include an assessment of—
innovative opportunities for water conservation in the study area to reduce water use and water system costs, including—
Feasibility study criteria
In general
Not later than 18 months after December 22, 2006, the Secretary shall promulgate criteria (including the feasibility factors listed under subsection (c)) under which the feasibility studies shall be assessed for completeness and appropriateness.
Inclusions
The Secretary shall include in the criteria promulgated under paragraph (1) methods to scale the level of effort needed to complete the feasibility assessment relative to the total size and cost of the proposed rural water supply project and reduce total costs to non-Federal entities.
Feasibility report
1 In general
After completion of appropriate feasibility studies for rural water supply projects that address the factors described in subsection (c) and the criteria promulgated under subsection (d), the Secretary shall—
develop a feasibility report that includes—
a recommendation of the Secretary on—
the appropriate non-Federal share of construction costs, which shall be—
if the Secretary recommends that the project should be authorized for construction—
Capability-to-pay
In general
In evaluating a proposed rural water supply project under this section, the Secretary shall—
Factors
In determining the financial capability of non-Federal project entities to pay for a rural water supply project under paragraph (1), the Secretary shall evaluate factors for the project area, relative to the State average, including—
Indian tribes
In determining the capability-to-pay of Indian tribe project beneficiaries, the Secretary may consider deferring the collection of all or part of the non-Federal construction costs apportioned to Indian tribe project beneficiaries unless or until the Secretary determines that the Indian tribe project beneficiaries should pay—
Cost-sharing requirement
In general
Except as otherwise provided in this subsection, the Federal share of the cost of a feasibility study carried out under this section shall not exceed 50 percent of the study costs.
Form
The non-Federal share under paragraph (1) may be in the form of any in-kind services that the Secretary determines would contribute substantially toward the conduct and completion of the study.
Financial hardship
The Secretary may increase the Federal share of the costs of a feasibility study if the Secretary determines, based on a demonstration of financial hardship, that the non-Federal participant is unable to contribute at least 50 percent of the costs of the study.
Larger communities
In conducting a feasibility study of a rural water supply system that includes a community with a population in excess of 50,000 inhabitants, the Secretary may require the non-Federal project entity to pay more than 50 percent of the costs of the study.
Consultation and cooperation
In addition to the non-Federal project entity, the Secretary shall consult and cooperate with appropriate Federal, State, tribal, regional, and local authorities during the conduct of each feasibility assessment and development of the feasibility report conducted under this subchapter.
(Pub. L. 109–451, title I, § 106, Dec. 22, 2006, 120 Stat. 3351.)