U.S. Code · Título 49
Speed limit action plans
49 U.S.C. § 20169
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
In General.—
Not later than March 3, 2016, each railroad carrier providing intercity rail passenger transportation or commuter rail passenger transportation, in consultation with any applicable host railroad carrier, shall survey its entire system and identify each main track location where there is a reduction of more than 20 miles per hour from the approach speed to a curve, bridge, or tunnel and the maximum authorized operating speed for passenger trains at that curve, bridge, or tunnel.Action Plans.—
Not later than 120 days after the date that the survey under subsection (a) is complete, a railroad carrier described in subsection (a) shall submit to the Secretary of Transportation an action plan that—
describes appropriate actions to enable warning and enforcement of the maximum authorized speed for passenger trains at each location identified under paragraph (1), including—
Approval.—
Not later than 90 days after the date on which an action plan is submitted under subsection (b) or (d)(2), the Secretary shall approve, approve with conditions, or disapprove the action plan.Periodic Reviews and Updates.—
Each railroad carrier that submits an action plan to the Secretary pursuant to subsection (b) shall—
New Service.—
If a railroad carrier providing intercity rail passenger transportation or commuter rail passenger transportation did not exist on the date of enactment of the FAST Act (Public Law 114–94; 129 Stat. 1312), such railroad carrier, in consultation with any applicable host railroad carrier, shall—
Alternative Safety Measures.—
The Secretary may exempt from the requirements under this section each segment of track for which operations are governed by a positive train control system certified under section 20157, or any other safety technology or practice that would achieve an equivalent or greater level of safety in reducing derailment risk.Prohibition.—
No new intercity or commuter rail passenger service may begin operation unless the railroad carrier providing such service is in compliance with the requirements under this section.Savings Clause.—
Nothing in this section may be construed to prohibit the Secretary from applying the requirements under this section to other segments of track at high risk of overspeed derailment.(Added Pub. L. 117–58, div. B, title II, § 22415(a), Nov. 15, 2021, 135 Stat. 746.)