U.S. Code · Título 49
Agreements for State and local operation of airport facilities
49 U.S.C. § 47124
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Government Relief From Liability.—
The Secretary of Transportation shall ensure that an agreement under this subchapter with a qualified entity (as determined by the Secretary), State, or a political subdivision of a State to allow the entity, State, or subdivision to operate an airport facility relieves the United States Government from any liability arising out of, or related to, acts or omissions of employees of the entity, State, or subdivision in operating the airport facility.Air Traffic Control Contract Program.—
Contract tower program.—
Continuation.—
The Secretary shall continue the low activity (Visual Flight Rules) level I air traffic control tower contract program established under subsection (a) of this section for towers existing on December 30, 1987, and extend the program to other towers as practicable.Special rule.—
If the Secretary determines that a tower already operating under the Contract Tower Program has a benefit-to-cost ratio of less than 1.0, the airport sponsor or State or local government having jurisdiction over the airport shall not be required to pay the portion of the costs that exceeds the benefit—
Use of excess funds.—
If the Secretary finds that all or part of an amount made available to carry out the program continued under this paragraph is not required during a fiscal year, the Secretary may use, during such fiscal year, the amount not so required to carry out the Cost-share Program.General authority.—
In general.—
The Secretary may make a contract with a qualified entity (as determined by the Secretary) or, on a sole source basis, with a State or a political subdivision of a State to allow the entity, State, or subdivision to operate an airport traffic control tower classified as a level I (Visual Flight Rules) tower if the Secretary decides that the entity, State, or subdivision has the capability to comply with the requirements of this paragraph. The contract shall require that the entity, State, or subdivision comply with applicable safety regulations in operating the facility and with applicable competition requirements in making a subcontract to perform work to carry out the contract.Small or medium hub airports.—
In the case of a contract entered into on or after the date of enactment of this subparagraph to operate an airport traffic control tower at a small or medium hub airport, the contract shall require the Secretary, after coordination with the airport sponsor and the entity, State, or subdivision, and not later than 18 months after the date of enactment of the FAA Reauthorization Act of 2024, to provide funding sufficient for the cost of wages and benefits of at least 2 air traffic controllers for each tower operating shift.Cost-share program.—
In general.—
The Secretary shall establish a program to contract for air traffic control services at nonapproach control towers, as defined by the Secretary, that do not qualify for the Contract Tower Program.Program components.—
In carrying out the Cost-share Program, the Secretary shall—
Priority.—
In selecting facilities to participate in the Cost-share Program, the Secretary shall give priority to the following facilities:
Costs exceeding benefits.—
If the costs of operating an air traffic tower under the Cost-share Program exceed the benefits, the airport sponsor or State or local government having jurisdiction over the airport shall pay the portion of the costs that exceed such benefit, with the maximum allowable local cost share capped at 20 percent. Airports with air service provided under part 121 of title 14, Code of Federal Regulations, and more than 25,000 passenger enplanements in calendar year 2014 shall be exempt from any cost-share requirement under this paragraph.Funding.—
Of the amounts appropriated pursuant to section 106(k)(1), not more than $10,350,000 for each of fiscal years 2012 through 2018 may be used to carry out this paragraph.Use of excess funds.—
If the Secretary finds that all or part of an amount made available under this paragraph is not required during a fiscal year, the Secretary may use, during such fiscal year, the amount not so required to carry out the Contract Tower Program.Benefit-to-cost calculation.—
Not later than 90 days after receiving an application to the Contract Tower Program, the Secretary shall calculate a benefit-to-cost ratio (as described in subsection (d)) for the applicable air traffic control tower for purposes of selecting towers for participation in the Contract Tower Program.Period for completion of an operational readiness inspection.—
The Secretary shall provide airport sponsors acting in good faith 7 years to complete an operational readiness inspection after receiving a benefit-to-cost ratio of air traffic control services for an airport.Construction of air traffic control towers.—
Grants.—
The Secretary may provide grants to a sponsor of—
a primary airport—
a public-use airport that is not a primary airport—
Eligibility.—
An airport sponsor shall be eligible for a grant under this paragraph only if—
in the case of a tower to be constructed under this paragraph from amounts made available under section 47114(d)(2)(B), the Secretary certifies that—
Safety Audits.—
The Secretary shall establish uniform standards and requirements for regular safety assessments of air traffic control towers that receive funding under this section.Criteria To Evaluate Participants.—
Timing of evaluations.—
Towers participating in cost-share program.—
In the case of an air traffic control tower that is operated under the Cost-share Program, the Secretary shall annually calculate a benefit-to-cost ratio with respect to the tower.Towers participating in contract tower program.—
In the case of an air traffic control tower that is operated under the Contract Tower Program, the Secretary shall not calculate a benefit-to-cost ratio after the date of enactment of this subsection with respect to the tower unless the Secretary determines that the annual aircraft traffic at the airport where the tower is located has decreased—
Costs to be considered.—
In establishing a benefit-to-cost ratio under this section with respect to an air traffic control tower, the Secretary shall consider only the following costs:
Other criteria to be considered.—
In establishing a benefit-to-cost ratio under this section with respect to an air traffic control tower, the Secretary shall add a 10 percentage point margin of error to the benefit-to-cost ratio determination to acknowledge and account for the direct and indirect economic and other benefits that are not included in the criteria the Secretary used in calculating that ratio.Review of cost-benefit determinations.—
In issuing a benefit-to-cost ratio determination under this section with respect to an air traffic control tower located at an airport, the Secretary shall implement the following procedures:
Upon receipt of a request for an appeal submitted pursuant to subparagraph (A), the Secretary shall—
After receiving a response from the Administrator pursuant to subparagraph (B), the Secretary shall—
Definitions.—
In this section:
Contract tower program.—
The term “Contract Tower Program” means the level I air traffic control tower contract program established under subsection (a) and continued under subsection (b)(1).Cost-share program.—
The term “Cost-share Program” means the cost-share program established under subsection (b)(3).Improving Controller Situational Awareness.—
In general.—
Not later than 1 year after the date of enactment of this subsection, the Secretary shall allow air traffic controllers at towers operated under the Contract Tower Program to use approved advanced equipment and technologies to improve operational situational awareness, including Standard Terminal Automation Replacement System radar displays, Automatic Dependent Surveillance-Broadcast, Flight Data Input/Output, and Automatic Terminal Information System.Installation and maintenance.—
Not later than 2 years after the date of enactment of this subsection, the Secretary shall allow airports to—
Requirements.—
To help facilitate the integration of the equipment and technology described in paragraph (1), the Secretary—
Liability Insurance.—
In general.—
Not later than 18 months after the date of enactment of this subsection, the Secretary shall consult with aviation industry experts, including air traffic control contractors and aviation insurance professionals, to determine adequate limits of liability for the Contract Tower Program.Interim steps.—
Not later than 6 months after the date of enactment of this subsection and until the Secretary makes a determination on liability limits under paragraph (1), the Secretary shall require air traffic control contractors to have excess liability insurance (as determined by the Secretary) to ensure continuity of such coverage should a major accident occur.Briefing.—
Not later than 24 months after the date of enactment of this subsection, the Secretary shall brief the Committee on Transportation and Infrastructure of the House of Representatives and the Commerce,2 Science, and Transportation of the Senate on the findings, conclusions, and actions taken and planned to be taken to carry out this subsection.Milestones for Design Approval of Remote Towers.—
In general.—
Not later than 180 days after the date of enactment of this subsection, the Administrator of the Federal Aviation Administration shall create a program and publish milestones to achieve system design and operational approval for a remote tower system.Requirements.—
In carrying out paragraph (1), the Administrator shall—
establish requirements for the system design and operational approval of remote towers, including—
System design approval and evaluation process.—
Not later than December 31, 2024, the Administrator shall expand the system design approval and evaluation process for a digital or remote tower system to not less than 3 airports at which a digital or remote tower will be installed or operated at airports not located at the William J. Hughes Technical Center and using the criteria under section 161 of the FAA Reauthorization Act of 2018 (49 U.S.C. 47104 note), to the extent the Administrator has willing technology providers and airports interested in the installation and operation of such towers.Preservation of existing design approvals.—
Nothing in this subsection shall be construed to invalidate any system design approval activity carried out by the William J. Hughes Technical Center prior to the date of enactment of this subsection.Prioritization for remote tower certification.—
In carrying out the program established under paragraph (1), the Administrator shall prioritize system design and operational approval for a remote tower system at—
(Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1276; Pub. L. 106–181, title I, § 131, Apr. 5, 2000, 114 Stat. 78; Pub. L. 108–7, div. I, title III, § 370(b)(1), (2), Feb. 20, 2003, 117 Stat. 425, 426; Pub. L. 108–176, title I, § 105, Dec. 12, 2003, 117 Stat. 2498; Pub. L. 112–55, div. C, title I, § 119, Nov. 18, 2011, 125 Stat. 649; Pub. L. 112–95, title I, § 147, Feb. 14, 2012, 126 Stat. 30; Pub. L. 113–76, div. L, title I, § 118, Jan. 17, 2014, 128 Stat. 581; Pub. L. 113–235, div. K, title I, § 118, Dec. 16, 2014, 128 Stat. 2704; Pub. L. 114–55, title I, § 102(c), Sept. 30, 2015, 129 Stat. 523; Pub. L. 114–141, title I, § 102(c), Mar. 30, 2016, 130 Stat. 323; Pub. L. 114–190, title I, § 1102(c), July 15, 2016, 130 Stat. 617; Pub. L. 115–63, title I, § 102(d), Sept. 29, 2017, 131 Stat. 1169; Pub. L. 115–141, div. M, title I, § 102(c), Mar. 23, 2018, 132 Stat. 1046; Pub. L. 115–254, div. B, title I, § 133(a)–(c), Oct. 5, 2018, 132 Stat. 3206–3208; Pub. L. 118–63, title VI, §§ 620, 621(a), (c), 625(b), (c), title VII, § 712(c)(2), title XI, § 1101(v), May 16, 2024, 138 Stat. 1234, 1235, 1237, 1242, 1256, 1414.)