U.S. Code · Título 50
Reports on the acquisition of major systems
50 U.S.C. § 3101
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Definitions
In this section:
The term “cost estimate”—
The term “current Baseline Estimate” means the projected total acquisition cost of a major system that is—
The term “program manager” means—
Major system cost reports
A major system cost report shall include the following information (as of the last day of the quarter for which the report is made):
Reports for breach of significant or critical cost growth thresholds
If the program manager of a major system for which a report has previously been submitted under subsection (b) determines at any time during a quarter that there is reasonable cause to believe that the total acquisition cost for the major system has increased by a percentage equal to or greater than the significant cost growth threshold or critical cost growth threshold and if a report indicating an increase of such percentage or more has not previously been submitted to the Director, then the program manager shall immediately submit to the Director a major system cost report containing the information, determined as of the date of the report, required under subsection (b).
Notification to Congress of cost growth
Requirement for Major System Congressional Report
Major System Congressional Report elements
Except as provided in paragraph (2), each Major System Congressional Report shall include the following:
The completion status of the major system—
The following contract performance assessment information with respect to each major contract under the major system:
A Major System Congressional Report prepared for a major system for which the increase in the total acquisition cost is due to termination or cancellation of the entire major system shall include only—
Prohibition on obligation of funds
If a determination of an increase by a percentage equal to or greater than the significant cost growth threshold is made by the Director under subsection (d) and a Major System Congressional Report containing the information described in subsection (f) is not submitted to Congress under subsection (e)(1), or if a determination of an increase by a percentage equal to or greater than the critical cost growth threshold is made by the Director under subsection (d) and the Major System Congressional Report containing the information described in subsection (f) and section 3102(b)(3) of this title and the certification required by section 3102(b)(2) of this title are not submitted to Congress under subsection (e)(2), funds appropriated for construction, research, development, test, evaluation, and procurement may not be obligated for a major contract under the major system. The prohibition on the obligation of funds for a major system shall cease to apply at the end of the 45-day period that begins on the date—
Treatment of cost increases prior to October 7, 2010
Not later than 180 days after October 7, 2010, the Director—
shall submit to Congress a report describing—
Requirements to use base year dollars
Any determination of a percentage increase under this section shall be stated in terms of constant base year dollars.
Form of report
Any report required to be submitted under this section may be submitted in a classified form.
(July 26, 1947, ch. 343, title V, § 506E, as added Pub. L. 111–259, title III, § 323(a)(1), Oct. 7, 2010, 124 Stat. 2674.)