U.S. Code · Título 49
Fixed guideway capital investment grants
49 U.S.C. § 5309
Office of the Law Revision Counsel · release 119-142
Se muestra el texto operativo de la sección. Las notas estatutarias y el historial de enmiendas están en la fuente oficial.
Definitions.—
In this section, the following definitions shall apply:
Applicant.—
The term “applicant” means a State or local governmental authority that applies for a grant under this section.Core capacity improvement project.—
The term “core capacity improvement project” means a substantial corridor-based capital investment in an existing fixed guideway system that increases the capacity of a corridor by not less than 10 percent. The term does not include project elements designed to maintain a state of good repair of the existing fixed guideway system.Corridor-based bus rapid transit project.—
The term “corridor-based bus rapid transit project” means a small start project utilizing buses in which the project represents a substantial investment in a defined corridor as demonstrated by features that emulate the services provided by rail fixed guideway public transportation systems, including defined stations; traffic signal priority for public transportation vehicles; short headway bidirectional services for a substantial part of weekdays; and any other features the Secretary may determine support a long-term corridor investment, but the majority of which does not operate in a separated right-of-way dedicated for public transportation use during peak periods.Fixed guideway bus rapid transit project.—
The term “fixed guideway bus rapid transit project” means a bus capital project—
that includes features that emulate the services provided by rail fixed guideway public transportation systems, including—
New fixed guideway capital project.—
The term “new fixed guideway capital project” means—
Small start project.—
The term “small start project” means a new fixed guideway capital project or corridor-based bus rapid transit project for which—
General Authority.—
The Secretary may make grants under this section to State and local governmental authorities to assist in financing—
Grant Requirements.—
In general.—
The Secretary may make a grant under this section for new fixed guideway capital projects, small start projects, or core capacity improvement projects, if the Secretary determines that—
the applicant has, or will have—
Certification.—
An applicant that has submitted the certifications required under subparagraphs (A), (B), (C), and (H) of section 5307(c)(1) shall be deemed to have provided sufficient information upon which the Secretary may make the determinations required under this subsection.Technical capacity.—
The Secretary shall use an expedited technical capacity review process for applicants that have recently and successfully completed at least 1 new fixed guideway capital project, or core capacity improvement project, if—
Recipient requirements.—
A recipient of a grant awarded under this section shall be subject to all terms, conditions, requirements, and provisions that the Secretary determines to be necessary or appropriate for purposes of this section.New Fixed Guideway Grants.—
Project development phase.—
Entrance into project development phase.—
A new fixed guideway capital project shall enter into the project development phase when—
the applicant—
the Secretary—
Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.Completion of project development activities required.—
In general.—
Not later than 2 years after the date on which a project enters into the project development phase, the applicant shall complete the activities required to obtain a project rating under subsection (g)(2) and submit completed documentation to the Secretary.Extension of time.—
Upon the request of an applicant, the Secretary may extend the time period under clause (i), if the applicant submits to the Secretary—
Engineering phase.—
In general.—
A new fixed guideway capital project may advance to the engineering phase upon completion of activities required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), as demonstrated by a record of decision with respect to the project, a finding that the project has no significant impact, or a determination that the project is categorically excluded, only if the Secretary determines that the project—
Determination that project is justified.—
In making a determination under subparagraph (A)(iii), the Secretary shall evaluate, analyze, and consider—
Core Capacity Improvement Projects.—
Project development phase.—
Entrance into project development phase.—
A core capacity improvement project shall be deemed to have entered into the project development phase if—
the applicant—
the Secretary—
Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification and local financial commitment under this subsection.Completion of project development activities required.—
In general.—
Not later than 2 years after the date on which a project enters into the project development phase, the applicant shall complete the activities required to obtain a project rating under subsection (g)(2) and submit completed documentation to the Secretary.Extension of time.—
Upon the request of an applicant, the Secretary may extend the time period under clause (i), if the applicant submits to the Secretary—
Engineering phase.—
In general.—
A core capacity improvement project may advance into the engineering phase upon completion of activities required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), as demonstrated by a record of decision with respect to the project, a finding that the project has no significant impact, or a determination that the project is categorically excluded, only if the Secretary determines that the project—
is in a corridor that is—
Determination that project is justified.—
In making a determination under subparagraph (A)(iv), the Secretary shall evaluate, analyze, and consider—
Financing Sources.—
Requirements.—
In determining whether a project is supported by an acceptable degree of local financial commitment and shows evidence of stable and dependable financing sources for purposes of subsection (d)(2)(A)(v) or (e)(2)(A)(v), the Secretary shall require that—
Considerations.—
In assessing the stability, reliability, and availability of proposed sources of local financing for purposes of subsection (d)(2)(A)(v) or (e)(2)(A)(v), the Secretary shall consider—
Project Advancement and Ratings.—
Project advancement.—
A new fixed guideway capital project or core capacity improvement project proposed to be carried out using a grant under this section may not advance from the project development phase to the engineering phase, or from the engineering phase to the construction phase, unless the Secretary determines that—
Ratings.—
Overall rating.—
In making a determination under paragraph (1), the Secretary shall evaluate and rate a project as a whole on a 5-point scale (high, medium-high, medium, medium-low, or low) based on—
Individual ratings for each criterion.—
In rating a project under this paragraph, the Secretary shall—
Medium rating not required.—
The Secretary shall not require that any single project justification criterion meet or exceed a “medium” rating in order to advance the project from one phase to another.Warrants.—
The Secretary shall, to the maximum extent practicable, develop and use special warrants for making a project justification determination under subsection (d)(2) or (e)(2), as applicable, for a project proposed to be funded using a grant under this section, if—
Letters of intent and early systems work agreements.—
In order to expedite a project under this subsection, the Secretary shall, to the maximum extent practicable, issue letters of intent and enter into early systems work agreements upon issuance of a record of decision for projects that receive an overall project rating of medium or better.Policy guidance.—
The Secretary shall issue policy guidance regarding the review and evaluation process and criteria—
Rules.—
Not later than 1 year after the date of enactment of the Federal Public Transportation Act of 2012, the Secretary shall issue rules establishing an evaluation and rating process for—
Project re-entry.—
In carrying out ratings and evaluations under this subsection, the Secretary shall provide full and fair consideration to projects that seek an updated rating after a period of inactivity following an earlier rating and evaluation.Applicability.—
This subsection shall not apply to a project for which the Secretary issued a letter of intent, entered into a full funding grant agreement, or entered into a project construction agreement before the date of enactment of the Federal Public Transportation Act of 2012.Small Start Projects.—
In general.—
A small start project shall be subject to the requirements of this subsection.Project development phase.—
Entrance into project development phase.—
A new small starts project shall enter into the project development phase when—
the applicant—
the Secretary—
Activities during project development phase.—
Concurrent with the analysis required to be made under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), each applicant shall develop sufficient information to enable the Secretary to make findings of project justification, policies and land use patterns that promote public transportation, and local financial commitment under this subsection.Selection criteria.—
The Secretary may provide Federal assistance for a small start project under this subsection only if the Secretary determines that the project—
Evaluation of benefits and federal investment.—
In making a determination for a small start project under paragraph (3)(B), the Secretary shall analyze, evaluate, and consider the following evaluation criteria for the project (as compared to a no-action alternative): mobility improvements, environmental benefits, congestion relief, economic development effects associated with the project, policies and land use patterns that support public transportation and cost-effectiveness as measured by cost per rider.Evaluation of local financial commitment.—
For purposes of paragraph (3)(C), the Secretary shall require that each proposed local source of capital and operating financing is stable, reliable, and available within the proposed project timetable.Ratings.—
In general.—
In carrying out paragraphs (4) and (5) for a small start project, the Secretary shall evaluate and rate the project on a 5-point scale (high, medium-high, medium, medium-low, or low) based on an evaluation of the benefits of the project as compared to the Federal assistance to be provided and the degree of local financial commitment, as required under this subsection. In rating the projects, the Secretary shall provide, in addition to the overall project rating, individual ratings for each of the criteria established by this subsection and shall give comparable, but not necessarily equal, numerical weight to the benefits that the project will bring to the community in calculating the overall project rating.Optional early rating.—
At the request of the project sponsor, the Secretary shall evaluate and rate the project in accordance with paragraphs (4) and (5) and subparagraph (A) of this paragraph upon completion of the analysis required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).Grants and expedited grant agreements.—
In general.—
The Secretary, to the maximum extent practicable, shall provide Federal assistance under this subsection in a single grant. If the Secretary cannot provide such a single grant, the Secretary may execute an expedited grant agreement in order to include a commitment on the part of the Secretary to provide funding for the project in future fiscal years.Terms of expedited grant agreements.—
In executing an expedited grant agreement under this subsection, the Secretary may include in the agreement terms similar to those established under subsection (k)(2).Notice of proposed grants and expedited grant agreements.—
At least 10 days before making a grant award or entering into a grant agreement for a project under this subsection, the Secretary shall notify, in writing, the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives and the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate of the proposed grant or expedited grant agreement, as well as the evaluations and ratings for the project.Programs of Interrelated Projects.—
Future bundling.—
Definition.—
In this paragraph, the term “future bundling request” means a letter described in subparagraph (B) that requests future funding for additional projects.Request.—
When an applicant submits a letter to the Secretary requesting entry of a project into the project development phase under subsection (d)(1)(A)(i)(I), (e)(1)(A)(i)(I), or (h)(2)(A)(i)(I), the applicant may include a description of other projects for consideration for future funding under this section. An applicant shall include in the request the amount of funding requested under this section for each additional project and the estimated capital cost of each project.Readiness.—
Other projects included in the request shall be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A), within 5 years of the initial project submitted as part of the request.Planning.—
Projects in the future bundling request shall be included in the metropolitan transportation plan in accordance with section 5303(i).Project sponsor.—
The applicant that submits a future bundling request shall be the project sponsor for each project included in the request.Program and project share.—
A future bundling request submitted under this paragraph shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.Benefits.—
The bundling of projects under this subsection—
shall enhance, or increase the capacity of—
shall—
Evaluation.—
Each project submitted for consideration for funding in a future bundling request shall be subject to the applicable evaluation criteria under this section for the project type, including demonstrating the availability of local resources to recapitalize, maintain, and operate the overall existing and proposed public transportation system pursuant to subsection (f)(1)(C).Letter of intent.—
In general.—
Upon entering into a grant agreement for the initial project for which an applicant submits a future bundling request, the Secretary may issue a letter of intent to the applicant that announces an intention to obligate, for 1 or more additional projects included in the request, an amount from future available budget authority specified in law that is not more than the amount stipulated as the financial participation of the Secretary in the additional project or projects in the future bundling. Such letter may include a condition that the project or projects must meet the evaluation criteria in this subsection before a grant agreement can be executed.Amount.—
The amount that the Secretary announces an intention to obligate for an additional project in the future bundling request through a letter of intent issued under clause (i) shall be sufficient to complete at least an operable segment of the project.Treatment.—
The issuance of a letter of intent under clause (i) shall not be deemed to be an obligation under sections 1108(c), 1501, and 1502(a) of title 31 or an administrative commitment.Immediate bundling.—
Definition.—
In this paragraph, the term “immediate bundling request” means a letter described in subparagraph (B) that requests immediate funding for multiple projects.Request.—
An applicant may submit a letter to the Secretary requesting entry of multiple projects into the project development phase under subsection (d)(1)(A)(i)(I), (e)(1)(A)(i)(I), or (h)(2)(A)(i)(I), for consideration for funding under this section. An applicant shall include in the request the amount of funding requested under this section for each additional project and the estimated capital cost of each project.Readiness.—
Projects included in the request must be ready to enter the project development phase under subsection (d)(1)(A), (e)(1)(A), or (h)(2)(A) at the same time.Planning.—
Projects in the bundle shall be included in the metropolitan transportation plan in accordance with section 5303(i).Project sponsor.—
The applicant that submits an immediate bundling request shall be the project sponsor for each project included in the request.Program and project share.—
An immediate bundling request submitted under this subsection shall include a proposed share of each of the request’s projects that is consistent with the requirements of subsections (k)(2)(C)(ii) or (h)(7), as applicable.Benefits.—
The bundling of projects under this subsection—
shall enhance, or increase the capacity of—
shall—
Evaluation.—
A project submitted for consideration for immediate funding in an immediate bundling request shall be subject to the applicable evaluation criteria under this section for the project type, including demonstrating the availability of local resources to recapitalize, maintain, and operate the overall existing and proposed public transportation system pursuant to subsection (f)(1)(C).Letter of intent or single grant agreement.—
In general.—
Upon entering into a grant agreement for the initial project for which an applicant submits a request, the Secretary may issue a letter of intent or single, combined grant agreement to the applicant.Letter of intent.—
In general.—
A letter of intent announces an intention to obligate, for 1 or more additional projects included in the request, an amount from future available budget authority specified in law that is not more than the amount stipulated as the financial participation of the Secretary in the additional project or projects. Such letter may include a condition that the project or projects must meet the evaluation criteria in this subsection before a grant agreement can be executed.Amount.—
The amount that the Secretary announces an intention to obligate for an additional project in a letter of intent issued under clause (i) shall be sufficient to complete at least an operable segment of the project.Treatment.—
The issuance of a letter of intent under clause (i) shall not be deemed to be an obligation under sections 1108(c), 1501, and 1502(a) of title 31 or an administrative commitment.Evaluation criteria.—
When the Secretary issues rules or policy guidance under this section, the Secretary may request comment from the public regarding potential changes to the evaluation criteria for project justification and local financial commitment under subsections (d), (e), (f), and (h) for the purposes of streamlining the evaluation process for projects included in a future bundling request or an immediate bundling request, including changes to enable simultaneous evaluation of multiple projects under 1 or more evaluation criteria. Notwithstanding paragraphs (1)(H) and (2)(H), such criteria may be utilized for projects included in a future bundling request or an immediate bundling request under this subsection upon promulgation of the applicable rule or policy guidance.Grant agreements.—
New start and core capacity improvement projects.—
A new start project or core capacity improvement project in an immediate bundling request or future bundling request shall be carried out through a full funding grant agreement or expedited grant agreement pursuant to subsection (k)(2).Small start.—
A small start project shall be carried out through a grant agreement pursuant to subsection (h)(7).Requirement.—
A combined grant agreement described in paragraph (2)(I)(i) shall—
Savings provision.—
The use of a combined grant agreement shall not waive or amend applicable evaluation criteria under this section for projects included in the combined grant agreement.Previously Issued Letter of Intent or Full Funding Grant Agreement.—
Subsections (d) and (e) shall not apply to projects for which the Secretary has issued a letter of intent, approved entry into final design, entered into a full funding grant agreement, or entered into a project construction grant agreement before the date of enactment of the Federal Public Transportation Act of 2012.Letters of Intent, Full Funding Grant Agreements, and Early Systems Work Agreements.—
Letters of intent.—
Amounts intended to be obligated.—
The Secretary may issue a letter of intent to an applicant announcing an intention to obligate, for a new fixed guideway capital project or core capacity improvement project, an amount from future available budget authority specified in law that is not more than the amount stipulated as the financial participation of the Secretary in the project. When a letter is issued for a capital project under this section, the amount shall be sufficient to complete at least an operable segment.Treatment.—
The issuance of a letter under subparagraph (A) is deemed not to be an obligation under sections 1108(c), 1501, and 1502(a) of title 31 or an administrative commitment.Full funding grant agreements.—
In general.—
A new fixed guideway capital project or core capacity improvement project shall be carried out through a full funding grant agreement.Criteria.—
The Secretary shall enter into a full funding grant agreement, based on the evaluations and ratings required under subsection (d), (e), or (i), as applicable, with each grantee receiving assistance for a new fixed guideway capital project or core capacity improvement project that has been rated as high, medium-high, or medium, in accordance with subsection (g)(2)(A) or (i)(3)(B), as applicable.Terms.—
A full funding grant agreement shall—
Special financial rules.—
In general.—
A full funding grant agreement under this paragraph obligates an amount of available budget authority specified in law and may include a commitment, contingent on amounts to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law.Statement of contingent commitment.—
The agreement shall state that the contingent commitment is not an obligation of the Government.Interest and other financing costs.—
Interest and other financing costs of efficiently carrying out a part of the project within a reasonable time are a cost of carrying out the project under a full funding grant agreement, except that eligible costs may not be more than the cost of the most favorable financing terms reasonably available for the project at the time of borrowing. The applicant shall certify, in a way satisfactory to the Secretary, that the applicant has shown reasonable diligence in seeking the most favorable financing terms.Completion of operable segment.—
The amount stipulated in an agreement under this paragraph for a new fixed guideway capital project shall be sufficient to complete at least an operable segment.Information collection and analysis plan.—
Submission of plan.—
Applicants seeking a full funding grant agreement under this paragraph shall submit a complete plan for the collection and analysis of information to identify the impacts of the new fixed guideway capital project or core capacity improvement project and the accuracy of the forecasts prepared during the development of the project. Preparation of this plan shall be included in the full funding grant agreement as an eligible activity.Contents of plan.—
The plan submitted under clause (i) shall provide for—
Collection of data on current system.—
To be eligible for a full funding grant agreement under this paragraph, recipients shall have collected data on the current system, according to the plan required under subparagraph (E)(ii), before the beginning of construction of the proposed new fixed guideway capital project or core capacity improvement project. Collection of this data shall be included in the full funding grant agreement as an eligible activity.Early systems work agreements.—
Conditions.—
The Secretary may enter into an early systems work agreement with an applicant if a record of decision under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been issued on the project and the Secretary finds there is reason to believe—
Contents.—
In general.—
An early systems work agreement under this paragraph obligates budget authority available under this chapter and title 23 and shall provide for reimbursement of preliminary costs of carrying out the project, including land acquisition, timely procurement of system elements for which specifications are decided, and other activities the Secretary decides are appropriate to make efficient, long-term project management easier.Contingent commitment.—
An early systems work agreement may include a commitment, contingent on amounts to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law.Period covered.—
An early systems work agreement under this paragraph shall cover the period of time the Secretary considers appropriate. The period may extend beyond the period of current authorization.Interest and other financing costs.—
Interest and other financing costs of efficiently carrying out the early systems work agreement within a reasonable time are a cost of carrying out the agreement, except that eligible costs may not be more than the cost of the most favorable financing terms reasonably available for the project at the time of borrowing. The applicant shall certify, in a way satisfactory to the Secretary, that the applicant has shown reasonable diligence in seeking the most favorable financing terms.Failure to carry out project.—
If an applicant does not carry out the project for reasons within the control of the applicant, the applicant shall repay all Federal grant funds awarded for the project from all Federal funding sources, for all project activities, facilities, and equipment, plus reasonable interest and penalty charges allowable by law or established by the Secretary in the early systems work agreement.Crediting of funds received.—
Any funds received by the Government under this paragraph, other than interest and penalty charges, shall be credited to the appropriation account from which the funds were originally derived.Limitation on amounts.—
In general.—
The Secretary may enter into full funding grant agreements under this subsection for new fixed guideway capital projects and core capacity improvement projects that contain contingent commitments to incur obligations in such amounts as the Secretary determines are appropriate.Appropriation required.—
An obligation may be made under this subsection only when amounts are appropriated for the obligation.Notification to congress.—
Not later than 15 days before issuing a letter of intent, entering into a full funding grant agreement, or entering into an early systems work agreement under this section, the Secretary shall notify, in writing, the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives of the proposed letter or agreement. The Secretary shall include with the notification a copy of the proposed letter or agreement as well as the evaluations and ratings for the project.Government Share of Net Capital Project Cost.—
In general.—
Estimation of net capital project cost.—
Based on engineering studies, studies of economic feasibility, and information on the expected use of equipment or facilities, the Secretary shall estimate the net capital project cost.Grants.—
Grant for new fixed guideway capital project.—
A grant for a new fixed guideway capital project shall not exceed 80 percent of the net capital project cost.Full funding grant agreement for new fixed guideway capital project.—
A full funding grant agreement for a new fixed guideway capital project shall not include a share of more than 60 percent from the funds made available under this section.Grant for core capacity improvement project.—
A grant for a core capacity improvement project shall not exceed 80 percent of the net capital project cost of the incremental cost to increase the capacity in the corridor.Grant for small start project.—
A grant for a small start project shall not exceed 80 percent of the net capital project costs.Adjustment for completion under budget.—
The Secretary may adjust the final net capital project cost of a new fixed guideway capital project or core capacity improvement project evaluated under subsection (d), (e), or (i) to include the cost of eligible activities not included in the originally defined project if the Secretary determines that the originally defined project has been completed at a cost that is significantly below the original estimate.Maximum government share.—
The Secretary may provide a higher grant percentage than requested by the grant recipient if—
Remaining costs.—
The remainder of the net capital project costs shall be provided—
Limitation on statutory construction.—
Nothing in this section shall be construed as authorizing the Secretary to require a non-Federal financial commitment for a project that is more than 20 percent of the net capital project cost.Special rule for rolling stock costs.—
In addition to amounts allowed pursuant to paragraph (1), a planned extension to a fixed guideway system may include the cost of rolling stock previously purchased if the applicant satisfies the Secretary that only amounts other than amounts provided by the Government were used and that the purchase was made for use on the extension. A refund or reduction of the remainder may be made only if a refund of a proportional amount of the grant of the Government is made at the same time.Limitation on applicability.—
This subsection shall not apply to projects for which the Secretary entered into a full funding grant agreement before the date of enactment of the Federal Public Transportation Act of 2012.Special rule for fixed guideway bus rapid transit projects.—
For up to three fixed-guideway bus rapid transit projects each fiscal year the Secretary shall—
Undertaking Projects in Advance.—
In general.—
The Secretary may pay the Government share of the net capital project cost to a State or local governmental authority that carries out any part of a project described in this section without the aid of amounts of the Government and according to all applicable procedures and requirements if—
Financing costs.—
In general.—
The cost of carrying out part of a project includes the amount of interest earned and payable on bonds issued by the State or local governmental authority to the extent proceeds of the bonds are expended in carrying out the part.Limitation on amount of interest.—
The amount of interest under this paragraph may not be more than the most favorable interest terms reasonably available for the project at the time of borrowing.Certification.—
The applicant shall certify, in a manner satisfactory to the Secretary, that the applicant has shown reasonable diligence in seeking the most favorable financing terms.Availability of Amounts.—
In general.—
An amount made available or appropriated for a new fixed guideway capital project or core capacity improvement project shall remain available to that project for 4 fiscal years, including the fiscal year in which the amount is made available or appropriated. Any amounts that are unobligated to the project at the end of the 4-fiscal-year period may be used by the Secretary for any purpose under this section.Use of deobligated amounts.—
An amount available under this section that is deobligated may be used for any purpose under this section.Reports on New Fixed Guideway and Core Capacity Improvement Projects.—
Annual report on funding recommendations.—
Not later than the first Monday in February of each year, the Secretary shall submit to the Committee on Banking, Housing, and Urban Affairs and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives a report that includes—
Biennial gao review.—
The Comptroller General of the United States shall—
conduct a biennial review that—
assesses—
includes, with respect to projects that entered into revenue service since the previous biennial review—
Special Rule.—
For the purposes of calculating the cost effectiveness of a project described in subsection (d) or (e), the Secretary shall not reduce or eliminate the capital costs of art and non-functional landscaping elements from the annualized capital cost calculation.Joint Public Transportation and Intercity Passenger Rail Projects.—
In general.—
The Secretary may make grants for new fixed guideway capital projects and core capacity improvement projects that provide both public transportation and intercity passenger rail service.Eligible costs.—
Eligible costs for a project under this subsection shall be limited to the net capital costs of the public transportation costs attributable to the project based on projected use of the new segment or expanded capacity of the project corridor, not including project elements designed to achieve or maintain a state of good repair, as determined by the Secretary under paragraph (4).Project justification and local financial commitment.—
A project under this subsection shall be evaluated for project justification and local financial commitment under subsections (d), (e), (f), and (h), as applicable to the project, based on—
Calculation of net capital project cost.—
The Secretary shall estimate the net capital costs of a project under this subsection based on—
Government share of net capital project cost.—
Government share.—
The Government share shall not exceed 80 percent of the net capital cost attributable to the public transportation costs of a project under this subsection as determined under paragraph (4).Non-government share.—
The remainder of the net capital cost attributable to the public transportation costs of a project under this subsection shall be provided from an undistributed cash surplus, a replacement or depreciation cash fund or reserve, or new capital.Capital Investment Grant Dashboard.—
In general.—
The Secretary shall make publicly available in an easily identifiable location on the website of the Department of Transportation a dashboard containing the following information for each project seeking a grant agreement under this section:
Updates.—
The Secretary shall update the information provided under paragraph (1) not less frequently than monthly.Project profiles.—
The Secretary shall continue to make profiles for projects that have applied for or are receiving assistance under this section publicly available in an easily identifiable location on the website of the Department of Transportation, in the same manner as the Secretary did as of the day before the date of enactment of this subsection.(Pub. L. 103–272, § 1(d), July 5, 1994, 108 Stat. 800; Pub. L. 104–287, § 5(9), (12), Oct. 11, 1996, 110 Stat. 3389; Pub. L. 102–240, title III, § 3049(a), as added Pub. L. 105–130, § 8, Dec. 1, 1997, 111 Stat. 2559; Pub. L. 105–178, title III, § 3009(a), (c)–(h)(1), (3)(D), (i)–(k), June 9, 1998, 112 Stat. 352–357; Pub. L. 105–206, title IX, § 9009(g), (h)(3), July 22, 1998, 112 Stat. 855, 856; Pub. L. 106–69, title III, § 347, Oct. 9, 1999, 113 Stat. 1024; Pub. L. 106–346, § 101(a) [title III, § 380], Oct. 23, 2000, 114 Stat. 1356, 1356A–42; Pub. L. 106–554, § 1(a)(4) [div. A, § 1101], Dec. 21, 2000, 114 Stat. 2763, 2763A–201; Pub. L. 108–88, § 8(a), Sept. 30, 2003, 117 Stat. 1121; Pub. L. 108–202, § 9(a), Feb. 29, 2004, 118 Stat. 484; Pub. L. 108–224, § 7(a), Apr. 30, 2004, 118 Stat. 632; Pub. L. 108–263, § 7(a), June 30, 2004, 118 Stat. 704; Pub. L. 108–271, § 8(b), July 7, 2004, 118 Stat. 814; Pub. L. 108–280, § 7(a), July 30, 2004, 118 Stat. 882; Pub. L. 108–310, § 8(a), Sept. 30, 2004, 118 Stat. 1154; Pub. L. 109–14, § 7(a), May 31, 2005, 119 Stat. 330; Pub. L. 109–20, § 7(a), July 1, 2005, 119 Stat. 352; Pub. L. 109–35, § 7(a), July 20, 2005, 119 Stat. 386; Pub. L. 109–37, § 7(a), July 22, 2005, 119 Stat. 401; Pub. L. 109–40, § 7(a), July 28, 2005, 119 Stat. 417; Pub. L. 109–59, title III, § 3011(a), Aug. 10, 2005, 119 Stat. 1573; Pub. L. 110–244, title II, § 201(d), June 6, 2008, 122 Stat. 1610; Pub. L. 111–147, title IV, § 433, Mar. 18, 2010, 124 Stat. 88; Pub. L. 111–322, title II, § 2303, Dec. 22, 2010, 124 Stat. 3527; Pub. L. 112–5, title III, § 303, Mar. 4, 2011, 125 Stat. 18; Pub. L. 112–30, title I, § 133, Sept. 16, 2011, 125 Stat. 350; Pub. L. 112–102, title III, § 303, Mar. 30, 2012, 126 Stat. 275; Pub. L. 112–140, title III, § 303, June 29, 2012, 126 Stat. 396; Pub. L. 112–141, div. B, § 20008(a), div. G, title III, § 113003, July 6, 2012, 126 Stat. 656, 984; Pub. L. 114–94, div. A, title III, § 3005(a), Dec. 4, 2015, 129 Stat. 1450; Pub. L. 117–58, div. C, § 30005(a), Nov. 15, 2021, 135 Stat. 894.)